Asset report

Kemess North gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Kemess North project comprised two deposits, Kemess Underground and Kemess East porphyry deposits. The deposits will be mined by block caving underground mining method. Ore is expected to be processed in Kemess South plant to produce copper concentrate containing gold and silver values. Kemess North Project is located approximately 430km northwest of Prince George, BC. The project is located 6.5km from the Kemess South open pit and plant site. The Kemess South open pit mine closed in March 2011.

What's included

This report contains

  • Document

    Kemess North gold mine

    XLS 125.50 KB

  • Document

    Kemess North gold mine project

    PDF 877.99 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898