Asset Report
Kemess South copper mine
Report summary
The Kemess South open cut mine closed in March 2011, after 13 years of operation. Northgate Minerals had owned and operated the mine since 2000 having produced some 2.7MOz of gold and 700Mlbs of copper. Focus has now moved to the Kemess North underground project located 5.5 km from the open cut which has been the subject of a preliminary assessment by Northgate. The underground project is the subject of a separate analysis.
Table of contents
- Summary
- Key issues
- CAPEX
- Closure
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Chibuluma South copper mine
A detailed analysis of the Chibuluma South copper mine.
$2,250
Asset Report
Kemess North copper mine project
A detailed analysis of the Kemess North copper mine project.
$2,250
Asset Report
Kemess South (Closed) gold mine
A detailed analysis of the Kemess South gold mine.
$2,250