Asset Report
Kerr-Sulphurets-Mitchell (KSM) gold mine project
Report summary
The KSM project is one of the worlds largest undeveloped copper-gold deposits, with 38Moz of gold and 10 billion pounds of copper in reserves. Based on the pre-feasibility study, the project has a 55 year lifespan with average annual gold and copper production of 500koz and 147Mlb respectively. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- CAPEX
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kerr-Sulphurets-Mitchell (KSM) copper mine project
A detailed analysis of the Kerr-Sulphurets-Mitchell (KSM) copper mine project.
$2,250
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250