Asset report

Kupol (Including Dvoinoye) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Kupol is an underground operation that utiliises mechanized sublevel mining methods. The processing plant comprises conventional gravity concentrate recovery followed by whole ore leaching. Merrill Crowe precipitation is used to produce doré bars.Effective December 31 2011 Dvoinoye was reclassified into the Kupol segment. Dvoinoye is a high grade deposit located 98km north of Kupol. Ore from Dvoinoye is processed at the Kupol mill and Kupol results are reported as a combined operation.

What's included

This report contains

  • Document

    Kupol (Including Dvoinoye) gold mine

    PDF 873.21 KB

  • Document

    Kupol (Including Dvoinoye) gold mine

    XLS 126.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898