Report summary

Construction of the smelter commenced on a greenfield site in July 1979. Lack of finance resulted in frequent interruptions to construction and generally slow progress. Start-up without an acid plant was finally achieved in June 1986 at a capital cost of US$376M. Serious commissioning problems were encountered, mainly due to an inexperienced labour force. The acid plant was added in 1988 at a capital cost of US$70M. Although production gradually improved between 1986 and 1990 it still...

What's included

This report contains

  • Document

    La Caridad copper smelter

    PDF 584.45 KB

  • Document

    La Caridad copper smelter.xls

    XLS 484.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:


  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1


  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in


Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898