Asset Report
La Cienega gold mine
Report summary
This is a gold, silver, lead, zinc underground mine with flotation and leaching facilities. The current capacity of the mill is 3.6kt/d. Total capex at start-up was estimated at US$70 million. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- CAPEX
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
La Cienega zinc mine
A detailed analysis of the La Cienega zinc mine.
$2,250
Asset Report
La Colorada gold mine
A detailed analysis of the La Colorada gold mine.
$2,250
Asset Report
Centauro - La Herradura gold mine
A detailed production, commercial and competitive analysis of the Centauro - La Herradura gold mine.
$2,250