This is a gold, silver, lead, zinc underground mine with flotation and leaching facilities. The current capacity of the mill is 3.6kt/d. Total capex at start-up was estimated at US$70 million. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.