Asset Report
Lisso bauxite mine
Report summary
Lisso began production in 2020 with the farm out arrangement in place with Alliance Guinéenne de Bauxite d'Alumine et d'Aluminium (AGB2A), and using their port facilities opposite the town of Boffa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
-
Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Lisso bauxite mine Emission Intensity Quartile Ranking - Total global production - Tonnes of bauxite
- Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Discovery Bay bauxite mine
A detailed analysis of the Discovery Bay bauxite mine.
$2,250
Asset Report
Bauxite Hills bauxite mine
After the completion of the Metro Mining Ltd. takeover of Gulf Alumina Ltd. in late 2016, combined reserves reached 96Mt of bauxite ore.
$2,250
Asset Report
SMB-WAP bauxite mine
The SMB-WAP project started shipments of bauxite to China in H2 2015.
$2,250