Asset Report

Liuzhou Longcheng zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The zinc smelter was put into operation in 1990 and comprised roasting and sulphuric acid plants. Slab zinc capacity was originally 35kt/a, but this was increased to 90 and finally 100kt/a in 2004. After a period dating from the early 2000's where a lack of feed materials restricted production, and poor economics, the smelter was finally closed in 2014 after its owner was declared bankrupt.

What's included

This report contains

  • Document

    Liuzhou Longcheng (Electrolytic) zinc smelter

    XLS 285.00 KB

  • Document

    Liuzhou Longcheng zinc smelter

    PDF 594.93 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Projects
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800