Asset report

Liuzhou Longcheng zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The zinc smelter was put into operation in 1990 and comprised roasting and sulphuric acid plants. Slab zinc capacity was originally 35kt/a but this was increased to 90 and finally 100kt/a in 2004. After a period dating from the early 2000's where a lack of feed materials restricted production and poor economics the smelter was finally closed in 2014 after its owner was declared bankrupt.

What's included

This report contains

  • Document

    Liuzhou Longcheng (Electrolytic) zinc smelter

    XLS 285.00 KB

  • Document

    Liuzhou Longcheng zinc smelter

    PDF 594.93 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Projects
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898