Asset Report

Liuzhou Longcheng zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

22 February 2016

Liuzhou Longcheng zinc smelter

Report summary

The zinc smelter was put into operation in 1990 and comprised roasting and sulphuric acid plants. Slab zinc capacity was originally 35kt/a, but this was increased to 90 and finally 100kt/a in 2004. After a period dating from the early 2000's where a lack of feed materials restricted production, and poor economics, the smelter was finally closed in 2014 after its owner was declared bankrupt.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Projects
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Liuzhou Longcheng (Electrolytic) zinc smelter

    XLS 285.00 KB

  • Document

    Liuzhou Longcheng zinc smelter

    PDF 594.93 KB

Other reports you may be interested in

Browse reports by Industry Sector