Asset report

Magino gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Magino is a past producing underground mine with potential to re start as a conventional open pit operation.Mine life is estimated at 10 years. Mill throughput is estimated at 10.95Mt/a (30kt/d) utilising agitated vat leaching followed by gold recovery from the cyanide solution by a carbon in pulp (CIP) circuit.

What's included

This report contains

  • Document

    Magino gold mine project

    XLS 123.00 KB

  • Document

    Magino gold mine project

    PDF 537.29 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898