Asset Report
Massena East aluminium smelter
Report summary
The remaining two Søderberg potlines were closed in 2014. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Massena West aluminium smelter
A detailed analysis of the Massena West aluminium smelter.
$2,250
Asset Report
Qinghai Yellow River aluminium smelter
A detailed analysis of the Qinghai Yellow River aluminium smelter.
$2,250
Asset Report
China East Grid (S) aluminium smelter
A detailed analysis of the China East Grid (S) aluminium smelter.
$2,250