Asset Report

Matilda (Wiluna Restart) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Wiluna mining operation is comprised of 20 open pits and three underground mines spanning four distinct mining centres being Wiluna, Matilda, Lake Way and Regent. In 2020, ore was sourced from three open pits and from the Golden Age underground deposit. All deposits are located within 20km of the mill, that is currently capable of processing up to 2.1Mt/a of non-refractory free milling ore in a carbon-in-leach circuit. Wiluna Mining have plans to expand gold production through a two-phased development, in order to unlock the sulphide potential. Stage 1 is expected to commence production in October 2021 and support annual gold production of between 100koz - 120koz.

Table of contents

  • Summary
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Matilda (Wiluna Restart) gold mine

    XLS 135.00 KB

  • Document

    Matilda (Wiluna Restart) gold mine

    PDF 1.12 MB

  • Document

    Matilda (Wiluna Restart) gold mine

    ZIP 976.14 KB