Asset Report

Mawu (Huize) zinc smelter

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

05 March 2019

Mawu (Huize) zinc smelter

Report summary

Due to its age and location, the Zhehai (Huize) smelter was closed in 2011, and its production was replaced by this new 100kt/a zinc (operationally 133kt/a)-60kt/a lead smelter situated at Mawu (near Huize). Mawu was planned to start production during 2012, however commissioning actually began in late 2013. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Flowsheet

Tables and charts

This report includes 13 images and tables including:

What's included

This report contains:

  • Document

    Mawu (Huize) zinc smelter.xls

    XLS 421.50 KB

  • Document

    Mawu (Huize) zinc smelter

    PDF 1.11 MB

  • Document

    Mawu (Huize) zinc smelter

    ZIP 1.16 MB

Trusted by leading organisations