Asset Report

Mawu (Huize) zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

28 November 2018

Mawu (Huize) zinc smelter

Report summary

Due to its age and location, the Zhehai (Huize) smelter was closed in 2011, and its production was replaced by this new 100kt/a zinc (operationally 133kt/a)-60kt/a lead smelter situated at Mawu (near Huize). Mawu was planned to start production during 2012, however commissioning actually began in late 2013.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participation: Table 1
  • Flowsheet
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Image 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Mawu (Huize) zinc smelter

    PDF 1.08 MB

  • Document

    Mawu (Huize) zinc smelter.xls

    XLS 421.50 KB