Asset Report
Zhehai (Huize) zinc smelter
Report summary
Zhehai (Huize) zinc smelter shared the site with a 25kt/a conventional sinter-blast furnace lead smelter. The flowsheet was complex with many cross-connections. Due to the age and location of the Zhehai (Huize) smelter it was closed in 2011 and replaced by a new 100kt/a zinc - 60kt/a lead smelter situated at Mawu (also near Huize). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Location / Transport
- Conc. Receipt / Storage
- Roaster
- Acid Plant
- Leach Plant
- Purification
- Tankhouse
- Casting Plant
- Residue Disposal
- Other
Tables and charts
This report includes 2 images and tables including:
- Detailed map
- Flowsheet
What's included
This report contains:
Other reports you may be interested in
18 November 2022
Mawu (Huize) zinc smelter
Asset Report
Mawu (Huize) zinc smelter
A detailed analysis of the Mawu (Huize) zinc smelter.
$2,25017 March 2022
Tak zinc smelter
Asset Report
Tak zinc smelter
A detailed analysis of the Tak zinc smelter.
$2,25027 May 2022
Valleyfield zinc smelter
Asset Report
Valleyfield zinc smelter
A detailed analysis of the Valleyfield zinc smelter.
$2,250