Asset Report
McCoy/Cove (Closed) lead mine
Report summary
This historic underground and open pit operation provided ore a heap leach operation. Pyrite concentrate was also produced and sold to Newmont. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Paroo Station lead mine
A detailed analysis along the production and comercialisation chain of the Paroo Station (Magellan) lead mine.
$2,250
Asset Report
Paroo Station Restart lead mine
A detailed analysis along of the Paroo Station Restart lead mine.
$2,250
Asset Report
Sorby Hills lead mine project
A detailed analysis of the Sorby Hills lead mine project.
$2,250