Asset Report

McIlvenna Bay (Hanson Lake) copper mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The project is owned by Foran Mining. A preliminary economic assessment study was completed on the project in November 2014. The study is based on a 14 year underground operation with an annual mill throughput of 1.8Mt. The plant will utilise differential flotation to produce separate copper, zinc concentrates along with a Pb-Cu concentrate from the Main Lens Zone 2 ore. All concentrates will contain payable amounts of silver and gold. 

What's included

This report contains

  • Document

    McIlvenna Bay (Hanson Lake) copper mine project

    XLS 496.50 KB

  • Document

    McIlvenna Bay (Hanson Lake) copper mine project

    PDF 648.38 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800