Meishan steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital cost
- Operating cash costs
Tables and charts
This report includes 11 images and tables including:
- Detailed map
- Participation
- Steel plant overview
- Downstream products
- Finished steel production
- Production table(Mt)
- Total operating cash costs: finished steel
What's included
This report contains:
Other reports you may be interested in
Shagang (BOF) steel plant
A detailed analysis of the Shagang (BOF) steel plant.
$2,250Global steel cost summary
Global average steelmaking costs are expected to soften by 5.4% in 2025, driven by falling raw material and energy prices.
$6,750Tangshan steel plant
Tangshan is dependent on imported iron ore and also purchases more than half of its coke from the merchant market.
$2,250