Metals & Mining Snapshot - May 2016
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Metals & Mining Snapshot - May 2016
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Xin Zhuye zinc smelter
A detailed analysis of the Xin Zhuye zinc smelter.
$2,250Poços de Caldas (CBA) bauxite mine
A detailed analysis of the Poços de Caldas (CBA) bauxite mine.
$2,250Ketapang alumina refinery
Ketapang alumina refinery is the first to produce metal grade alumina in Indonesia.
$2,250