Asset Report

Mianchi bauxite mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The 800kt/a Mianchi open pit mine complex supplies both the Zhengzhou refinery (located in Gongyi City in Henan Province, 163km from the mine) and the Shandong refinery (located in Zibo city in Shandong Province, 770km from the mine). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Mianchi bauxite mine

    XLS 89.00 KB

  • Document

    Mianchi bauxite mine

    PDF 927.81 KB

  • Document

    Mianchi bauxite mine

    ZIP 762.03 KB