Report summary
This analysis considers the potential restart of Michilla SxEw, which was previously operated between 1992 and 2015. The restart operation would process ore from a new open pit as well as from tailings to produce approximately 167 kt of cathode copper over a 10 year mine life. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Mining
- Processing
- Leach
- SxEw
- Royalties and taxes
- Community relations
- Environmental reclamation
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Milpillas SxEw copper mine
A detailed production and cost competitive analysis of the Milpillas SxEw copper mine.
$2,250
Asset Report
Gunnison SxEw copper mine project
A detailed analysis of the Gunnison SxEw copper mine project.
$2,250
Asset Report
Boleo SxEw copper mine
A detailed analysis of the Boleo SxEw copper mine.
$2,250