Asset Report
Michiquillay copper mine project
Report summary
The project assumes an open pit and conventional copper-moly concentrator. An old plan indicated a mill of 65kt/d that would double its capacity after the 5th year. Later on Nexa resources (before Milpo) was proposing development of this project in two stages of 40kt/d ore each. After Southern Peru won the privatisation of Magistral in 2018, this proposed option to 80kt/d ore in two stages is not longer applicable. We believe that Southern will go directly of a much higher economic of scale. We are conservatively estimating a mine-mill capacity of 100kt/d ore.
Table of contents
- Summary
- Key issues
- Emissions
- Royalties and taxes
Tables and charts
This report includes 2 images and tables including:
- Michiquillay Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Udokan copper mine project
A detailed analysis of the Udokan copper mine.
$2,250