Asset Report
Mindoro nickel project
Report summary
The Mindoro Nickel project is Intex Resources‘ main asset. In late 2006, when the company was established and listed as a separate company from Crew Gold Corporation, the project was reactivated. A Definitive Feasibility Study was delivered by Aker Solutions in February 2010. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Mindoro Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project
A detailed analysis of the Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project.
$2,250
Asset Report
Fisher East nickel project
A detailed cost analysis of the Fisher East nickel project.
$2,250
Asset Report
Araguaia nickel project
A detailed analysis of the Araguaia nickel project.
$2,250