Asset report

Montagne d'Or gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Following the completion of a feasibility study in March 2017 Nordgold acquired a 55% stake in the project with the balance held by Columbus Gold. The feasibility study is based on a 12 year operation with the deposit being mined by conventional open pit mining methods Average annual gold production over the first 10 years is 232koz. Initial capital cost is US$535 million. The report assumes a start up date of 2022 in line with company guidance.

What's included

This report contains

  • Document

    Montagne d'Or gold mine project

    XLS 126.00 KB

  • Document

    Montagne d'Or gold mine project

    PDF 503.22 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed Map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Tubarao steel plant

Asset report

Santa Cruz steel plant

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898