Report summary
Montana Tunnels is to be mined by open pit mining methods and Golden Dream by underground mining methods. The ore is to be treated in a 15kt/d ore capacity mill. The accompanying analysis covers the Montana Tunnels Restart and the Gold Dream Project and excludes the East Butte and Diamond Hill deposits which Eastern Resources is targeting for later development. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
Tables and charts
This report includes 2 images and tables including:
- Montana Tunnels Restart Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Montana Tunnels Restart gold mine
A detailed analysis of the Montana Tunnels Restart gold mine.
$2,250
Asset Report
San Martin Restart zinc mine project
A detailed analysis along the production and comercialisation chain of the San Martin Restart zinc mine project
$2,250
Asset Report
Hellyer Tailings Restart zinc mine
A detailed analysis of the Hellyer Tailings Restart zinc mine.
$2,250