Asset Report
Mt Garnet zinc mine
Report summary
The accompanying analysis considers the restart of the Mt Garnet concentrator which consists of polymetallic (500kt/a) and copper (500kt/a) circuits. The operation which included the Mt Garnet concentrator, the nearby Mt Garnet mine, the Balcooma-Surveyor Mine, along with various other projects and mining tenements, plant and equipment are owned by Consolidated Tin Limited. The company entered into voluntary administration in July 2016 and placed the Mt Garnet operation on care and maintenance. The operation subsequently restarted in July 2017.
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Mt Garnet Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mt Garnet (Copper Plant) copper mine
A detailed analysis of the Mt Garnet (Copper Plant) copper mine.
$2,250
Asset Report
Mt Garnet copper mine
A detailed analysis of the Mt Garnet copper mine.
$2,250
Asset Report
Balcooma (Thalanga) (closed) zinc mine
A detailed analysis of the Balcooma (Thalanga) zinc mine.
$2,250