Asset Report

Murrin Murrin nickel operation

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Murrin Murrin was developed as one of three plants during the late 1990's which were to be the "new wave of high pressure acid leach plants". These were to "revolutionise" global nickel production, producing nickel at very low cash costs (due to cobalt credits and the use of sulphur to produce acid and energy). As things transpired, this wasn't quite the case on all fronts and both Cawse and Bulong (the two smaller plants commissioned around the same time) have since closed and Murrin took a long time to reach capacity on a consistent basis.

What's included

This report contains

  • Document

    MumNi.xls

    XLS 778.00 KB

  • Document

    Murrin Murrin nickel operation

    PDF 332.77 KB

  • Document

    Murrin Murrin nickel operation flowsheet

    PDF 16.70 KB

Table of contents

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Cashflow

Images

  • Production: Image 1
  • Costs: Image 1
  • Location maps: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800