Asset report

New Afton gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The New Afton underground block caving project commenced operations in June 2012 and is expected to reach full capacity in early 2013. The accompanying analysis assumes a mine life of 14 years and maximum milling rate of 4Mtpa with annual production averaging 120kt of copper concentrate containing 34kt copper and 85 000oz gold. The Afton deposit which previously included the Ajax deposit was originally mined by open pit from 1978 to 1991 and then from 1994 to 1997 when it closed due...

What's included

This report contains

  • Document

    New Afton gold mine

    XLS 131.50 KB

  • Document

    New Afton gold mine

    PDF 620.14 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898