Asset Report
New Liberty gold mine
Get this report
$2,250
You can pay by card or invoice
Report summary
The New Liberty is a conventional open pit operation utilising drill, load and haul mining methods. Ore is processed using both gravity and carbon-in-leach (CIL) circuits. The plant design capacity is 1.1Mt/a. First gold pour was announced in June 2015. Gold production is estimated at 100koz - 130koz/a over an 8 year mine life.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Geology
-
Operations
- Mining
- Process
-
Infrastructure
- Power
-
Costs
- CAPEX
- Timeline
Tables and charts
This report includes 2 images and tables including:
- Key facts: Table 1
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2018
Halilaga gold mine project
Asset Report
Halilaga gold mine project
A detailed analysis of the Halilaga gold mine project.
$2,25022 December 2015
Moris gold mine
Asset Report
Moris gold mine
A detailed analysis of the Moris gold mine.
$2,25015 December 2017
Hengbang gold mine
Asset Report
Hengbang gold mine
A detailed analysis of the Hengbang gold mine.
$2,250Trusted by leading organisations








