Asset Report
Ntaka Hill nickel project
Report summary
The Ntaka Hill Nickel Sulphide Project, located in southeastern Tanzania. A number of mineralised zones have been defined at Ntaka Hill, which sits at the northern end of a 7 km long zone of ultramafic rocks prospective for both massive and disseminated types of nickel sulphide mineralisation. According to IMX Resources Ntaka Hill Nickel Sulphide Project has demonstrated the potential to produce a very clean, high-grade, premium quality nickel concentrate by utilising simple conventional froth flotation.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
17 December 2021
Algeria LNG - Overall Project Summary
Asset Report
Algeria LNG - Overall Project Summary
Algeria has three operational LNG plants and one decommissioned plant. It has 17 trains with 25.8 mmtpa of nominal capacity.
$2,25006 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25005 August 2021
Goongarrie nickel project
Asset Report
Goongarrie nickel project
A detailed analysis of the Goongarrie nickel project.
$2,250