Asset Report

Pingdingshan alumina refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

SGA is supplied to the nearby 400kt/a Yichuan smelter as well as Shenhuo's Xinjiang-based smelter. The plant was commissioned in 2000 to produce NMA and in 2005 switched to produce largely SGA. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Bauxite
  • Caustic soda
  • Lime
  • Digestion
  • Calcining
  • Power
  • Red mud

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Pingdingshan alumina refinery

    XLS 120.50 KB

  • Document

    Pingdingshan bauxite mine

    XLS 88.50 KB

  • Document

    Pingdingshan alumina refinery

    PDF 1.30 MB

  • Document

    Pingdingshan alumina refinery

    ZIP 1.08 MB