Asset Report
Pirdop copper refinery
Report summary
The refinery is located between Zlatica and Pirdop, and is near Srednogorie some 80km west of Sofia. It was constructed as a state owned operation using Soviet expertise to treat anodes from the adjacent Pirdop smelter. At commissioning in 1958 it was known as the Georgi Damianov refinery and had a capacity of 64kt/a cathode. By 1998 the capacity was said to be 60kt/a using PCR, but only 40kt/a in DC mode. In 1987 the smelter capacity was increased to 120kt/a anode. A 130kt/a cathode...
Table of contents
- Emissions
Tables and charts
This report includes 2 images and tables including:
- Pirdop Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yunnan (Kunming) copper refinery
A detailed analysis of the Yunnan (Kunming) copper refinery.
$2,250
Asset Report
Chifeng Jinfeng (closed) copper refinery
A detailed analysis of the Chifeng Jinfeng copper refinery.
$2,250
Asset Report
Chifeng Jinjian copper refinery
A detailed analysis of the Chifeng Jinjian copper refinery.
$2,250