Asset Report

Pirdop copper smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

20 August 2018

Pirdop copper smelter

Report summary

The smelter was constructed as a state owned operation using Soviet expertise to treat concentrate from the local mines at Assarel, Elatsite and Chelopech.  At commissioning in 1958 it used an electric furnace as the prime smelting unit.  Anodes were refined in the adjacent 64kt/a cathode Pirdop refinery.  A slag flotation plant was added in 1977 and a single contact acid plant was constructed in 1981. In 1987 the electric furnace was replaced by an Outokumpu flash furnace rated at 120t/h...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Production
  • Products: Table 1
  • Products allocation
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Pirdop copper smelter

    PDF 1.12 MB

  • Document

    Pirdop copper smelter.xls

    XLS 414.50 KB

Other reports you may be interested in

Browse reports by Industry Sector