Asset report

Platosa zinc mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The operation is comprised of an underground mine and a 350tpd ore concentrator called Miguel Auza that produces silver lead and silver zinc concentrates. Platosa mine is currently feeding around 156tpd into the mill. From 2017 to 2020 the average mill production is expected to be around 300tpd as the Mine Dewatering Project is to be completed mid 2016.

What's included

This report contains

  • Document

    Platosa zinc mine

    XLS 543.00 KB

  • Document

    Platosa zinc mine

    PDF 659.08 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Sales contracts
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898