Asset report

Plovdiv zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The decision to construct a zinc smelter at Plovdiv was taken in 1957 to enable the processing of the expanded output of concentrates in the Rhodopi region. Design and construction took place between 1959 and 1961 and the zinc plant capacity 35kt/a was commissioned at the end of 1961 being expanded to 55kt/a in 1963; lead production at the 50kt/a sinter blast furnace pyro refining lead smelter that shares the same site started at the end of 1963. Other sections for the production of...

What's included

This report contains

  • Document

    Plovdiv (Electrolytic) zinc smelter

    XLS 290.00 KB

  • Document

    Plovdiv zinc smelter

    PDF 779.41 KB

  • Document

    Plovdiv zinc smelter.xls

    XLS 537.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898