Asset report

Pobuzhsky nickel operation

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Prior to its acquisition by Solway in 2003 Pobuzhsky (built in 1972) had been under receivership and idle for more than 3 years due to unprofitable processing of low grade nickel ore from the local open pits. Solway entered into long term partnerships with suppliers of high grade nickel ore from Indonesia and New Caledonia and metal trading companies in Europe. Within a year of new management the plant was relaunched and two modernized 33 MW electric furnaces became operational. As a result of these measures the total processing capacity of the plant reached 1.5Mt/a.

What's included

This report contains

  • Document

    Pobuzhsky nickel operation

    XLS 267.00 KB

  • Document

    Pobuzhsky nickel operation

    PDF 1.53 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898