Asset Report

Podgorica alumina refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Podgorica refinery was commissioned as the Titograd operation in 1972. It was put in operation to supply the adjacent smelter. The refinery has a nameplate capacity of 260ktpa and was supplied by bauxite from the RBN mine. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Bauxite
  • Digestion
  • Calcining
    • Red Mud
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Podgorica alumina refinery

    PDF 1.07 MB