The Porcupine complex comprises the Hoyle Pond and Dome underground mines, Hollinger open pit, large tonnage stockpiles and other mining claims across 38,000ha, located in Timmins, Ontario. The mine complex produced 319koz in 2020. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset