Asset Report
Port Kembla (closed) copper smelter
Report summary
The Electrolytic Refining & Smelting Company of Australia (ER&S) was formed in 1908 to electrolytically refine blister from Mount Morgan and to smelt local copper and precious metals ores. In 1938 the smelter was expanded by the installation of a blast furnace and two small converters, and in 1959 a larger blast furnace was installed together with a Lurgi updraught sinter machine. Historically the smelter has always treated substantial tonnages of scrap and secondary materials. In 1980,...
Table of contents
- Flowsheet
- Feed preparation
- Smelting process
- Auxiliary plants
- Environmental
Tables and charts
This report includes 4 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ghatsila (closed) copper smelter
A detailed analysis of the Ghatsila copper smelter.
$2,250
Asset Report
Kosaka (closed) copper smelter
A detailed analysis of the Kosaka copper smelter.
$2,250
Asset Report
Gaspe (closed) copper smelter
A detailed analysis of the Gaspe copper smelter.
$2,250