Asset report

President Steyn (Closed) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Harmony split the operations with Steyn 1 and 2 being managed by Bambanani and Loraine 3 being renamed Target 3 and becoming part of the Target operations. This profile is now closed since the President Steyn operations no longer exist as a separate entity See Harmony Freegold Operations and Target (& Lorraine) profiles for details of production from 2010. The operations were acquired by Thistle Mining in 2002. In 2004 the continued strength of the South African Rand and production...

What's included

This report contains

  • Document

    President Steyn (Closed) gold mine

    XLS 126.00 KB

  • Document

    President Steyn (Closed) gold mine

    PDF 429.88 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

Asset report

Buzwagi gold mine

Asset report

Bulyanhulu gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898