PT Freeport Indonesia (Grasberg) copper mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Emissions
-
Mining
- Underground Mines
- Big Gossan (2010 - 2041)
- Process
- New smelter
- Power
- Water
- Capex
-
Operating cost
- Labour
- By-Product Credits
Tables and charts
This report includes 2 images and tables including:
- PT Freeport Indonesia(Grasberg) Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
PT Freeport Indonesia (Grasberg) gold mine
A detailed analysis of the PT Freeport Indonesia (Grasberg) gold mine.
$2,250Gresik copper smelter
A detailed analysis of the Gresik copper smelter.
$2,250Gresik copper refinery
A detailed analysis of the Gresik copper refinery.
$2,250