Asset Report

Qingzhen alumina refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Production capacity at the refinery is expected to reach 800kt/a by 2015. SGA will supply Guizhou-based smelters and be sold to trading companies. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Bauxite
  • Digestion
  • Calcining
    • Red Mud
  • Power

Tables and charts

This report includes 2 images and tables including:

  • Qingzhen Emission Intensity Quartile ranking – total global production - tonnes alumina
  • Detailed map

What's included

This report contains:

  • Document

    Qingzhen alumina refinery

    XLS 121.50 KB

  • Document

    Yangjiadong bauxite mine

    XLS 88.50 KB

  • Document

    Qingzhen alumina refinery

    PDF 1.68 MB

  • Document

    Qingzhen alumina refinery

    ZIP 1.10 MB