Asset report

Romero gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The project is owned and currently being developed by Goldquest Mining Corp. A preliminary economic assessment study on the project was released in Q2 2015. The study assumes a 10 year operation with underground mining using using longhole and drift & fill with cemented paste backfill. The ore is to be treated in a 2.5kt/d mill and conventional flotation plant producing a gold and copper containing copper concentrate. Initial pre production capital cost has been estimated at US$143 million.

What's included

This report contains

  • Document

    Romero gold mine

    XLS 114.00 KB

  • Document

    Romero gold mine

    PDF 343.88 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed Map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898