Asset report

Romero gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The project is owned and currently being developed by Goldquest Mining Corp. A preliminary economic assessment study on the project was released in Q2 2015. The study assumes a 10 year operation with underground mining using using longhole and drift & fill with cemented paste backfill. The ore is to be treated in a 2.5kt/d mill and conventional flotation plant producing a gold and copper containing copper concentrate. Initial pre production capital cost has been estimated at US$143 million.

What's included

This report contains

  • Document

    Romero gold mine

    XLS 114.00 KB

  • Document

    Romero gold mine

    PDF 343.88 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed Map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898