Asset report

Romero gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The project is owned and currently being developed by Goldquest Mining Corp. A preliminary economic assessment study on the project was released in Q2, 2015. The study assumes a 10 year operation with underground mining using using longhole and drift & fill with cemented paste backfill. The ore is to be treated in a 2.5kt/d mill and conventional flotation plant producing a gold and copper containing copper concentrate. Initial pre-production capital cost has been estimated at US$143 million.

What's included

This report contains

  • Document

    Romero gold mine

    XLS 114.00 KB

  • Document

    Romero gold mine

    PDF 343.88 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed Map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898