Asset report

Rovina gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The project consists of the three deposits Rovina Colnic and Ciresata. Rovina is the most northern deposit; Colnic is situated 2.5km south of the Rovina property and the Ciresata approximately 4.5km south of the Colnic. Rovina and Colnic will be exploited by open pit mining methods whilst the Ciresata will be exploited by bulk underground mining methods. The 2022 start up date is indicative only.

What's included

This report contains

  • Document

    Rovina gold mine project

    XLS 135.50 KB

  • Document

    Rovina gold mine project

    PDF 981.37 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898