Rovina consists of three deposits; Rovina, Colnic and Ciresata. Rovina and Colnic will be exploited by open pit mining methods. An updated Definitive Feasibility Study released in 2025 proposes an initial development to exploit the Colnic and Rovina deposits by open pit mining, over a 17.2 year mine life. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.