Asset Report

Ruashi Etoile copper minesite

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Ruashi copper mine is an open pit operation located in the DRC with processing plant and on-site SxEw facility. Two main products produced from the operation are copper cathode and cobalt hydroxide. The accompanying analysis covers the resumption of production from historic Ruashi mine from 2009 onwards, Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • CAPEX
    • Phase I (2005 - 2008)
    • Phase II (Q4 2008 - Present)
    • Phase I (2005 - 2008)
    • Phase II (Q4 2008 - Present)

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Ruashi Etoile copper minesite

    XLS 406.50 KB

  • Document

    Ruashi Etoile copper minesite

    PDF 1.24 MB