Asset Report
Sarcheshmeh copper mine
Report summary
Sarcheshmeh is an open-pit mine and mill located 160km south-west of Kerman and 65km south-east of Rafsanjan at an average altitude of 2,600m. The operation is integrated with the Sarcheshmeh and Khatoon Abad smelters, and the Sarcheshmeh refinery. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Operating
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
12 December 2022
Huayue Nickel Cobalt HPAL nickel operation
Asset Report
Huayue Nickel Cobalt HPAL nickel operation
A detailed analysis of Huayue Nickel and Cobalt HPAL nickel operation
$2,25006 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25005 August 2021
West Musgrave nickel project
Asset Report
West Musgrave nickel project
A detailed analysis of the West Musgrave nickel project.
$2,250