Asset Report
Sepon gold mine
Report summary
The accompanying analysis is based on the Sepon oxide gold operation. Copper production and associated costs have been excluded. The gold and copper operations do not share a common process route and share little infrastructure and so no copper credit is applied to the gold costs. The mine was place on care and maintenance at the end of 2013. Sepon recommenced gold production following first gold pour on 23rd June 2020. The oxide gold ore plant was refurbished following 11 months of work.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sepon (Khanong) SxEw copper mine
A detailed analysis of the Sepon (Khanong) SxEw copper mine.
$2,250
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,250
Asset Report
Osborne gold mine
A detailed analysis of the Osborne gold mine.
$2,250