Asset report

Shanxi Huaze aluminium smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Shanxi Huaze was commissioned in 2005. The smelter consists of two lines configured in two halls. Power is self generated and surplus is sold to the grid.

What's included

This report contains

  • Document

    Shanxi Huaze aluminium smelter

    XLS 99.50 KB

  • Document

    Shanxi Huaze aluminium smelter

    PDF 284.15 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898