Asset Report

Shaoguan (ISF) zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

No1 ISF was commissioned in 1976 and No.2 in 1996, the plant then comprised two complete streams of sinter plant - blast furnace - zinc refinery. In October 2010 both ISF furnaces were forced to stop production due to a pollution incident. In September 2012, it was announced that No.2 ISF was to restart. However this furnace is only likely to operate until a brand new 150kt/a electrolytic zinc plant is commissioned, after this time the ISF plant at Shaoguan will close permanently.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Location / Transport
  • Conc. Receipt / Storage
  • Sinter Plant
  • Acid Plant
  • Refining
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 9 images and tables including:

  • Shaoguan ISF Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Leaching and Purification
  • Sinter Plant
  • Smelting
  • Refining
  • Casting

What's included

This report contains:

  • Document

    Shaoguan (ISF) zinc smelter

    PDF 1.70 MB