Asset Report
Shaoguan (ISF) zinc smelter
Report summary
No1 ISF was commissioned in 1976 and No.2 in 1996, the plant then comprised two complete streams of sinter plant - blast furnace - zinc refinery. In October 2010 both ISF furnaces were forced to stop production due to a pollution incident. In September 2012, it was announced that No.2 ISF was to restart. However this furnace is only likely to operate until a brand new 150kt/a electrolytic zinc plant is commissioned, after this time the ISF plant at Shaoguan will close permanently.
Table of contents
- Summary
- Key issues
- Emissions
- Location / Transport
- Conc. Receipt / Storage
- Sinter Plant
- Acid Plant
- Refining
- Casting Plant
- Residue Disposal
- Other
Tables and charts
This report includes 9 images and tables including:
- Shaoguan ISF Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
- Flowsheet
- Feed Preparation
- Leaching and Purification
- Sinter Plant
- Smelting
- Refining
- Casting
What's included
This report contains:
Other reports you may be interested in
Asset Report
Duisburg (ISF) zinc smelter
A detailed analysis of the Duisburg (ISF) zinc smelter.
$2,250
Asset Report
Shaoguan zinc smelter project
A detailed analysis of the Shaoguan zinc smelter project.
$2,250
Asset Report
Hachinohe (ISF) zinc smelter
A detailed analysis of the Hachinohe (ISF) zinc smelter.
$2,250