Asset Report

Shaoguan (ISF) zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

28 November 2018

Shaoguan (ISF) zinc smelter

Report summary

No1 ISF was commissioned in 1976 and No.2 in 1996, the plant then comprised two complete streams of sinter plant - blast furnace - zinc refinery. In October 2010 both ISF furnaces were forced to stop production due to a pollution incident. In September 2012, it was announced that No.2 ISF was to restart. However this furnace is only likely to operate until a brand new 150kt/a electrolytic zinc plant is commissioned, after this time the ISF plant at Shaoguan will close permanently.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Refining
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Shaoguan (ISF) zinc smelter

    PDF 1.15 MB

  • Document

    Shaoguan (ISF) zinc smelter.xls

    XLS 473.50 KB