Asset report

Shaoguan (ISF) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

No1 ISF was commissioned in 1976 and No.2 in 1996 the plant then comprised two complete streams of sinter plant blast furnace zinc refinery. In October 2010 both ISF furnaces were forced to stop production due to a pollution incident. In September 2012 it was announced that No.2 ISFwas to restart. However this furnace is only likely to operate until a brand new 150kt/a electrolytic zinc plant is commissioned after this time the ISF plant at Shaoguan will close permanently.

What's included

This report contains

  • Document

    Shaoguan (ISF) zinc smelter

    PDF 726.90 KB

  • Document

    Shaoguan (ISF) zinc smelter.xls

    XLS 536.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898