Asset report

Shifang (Hongda) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The zinc smelter at Shifang was built in 1989 with a nominal capacity of 10kt/a zinc slab which was later developed to produce up to 30kt/a. A major expansion in 2002 brought the capacity to 75kt/a slab zinc. Further debottlenecking in 2003 raised capacity to the current 100kt/a slab zinc.

What's included

This report contains

  • Document

    Shifang (Hongda) zinc smelter

    PDF 675.08 KB

  • Document

    Shifang (Hongda) zinc smelter.xls

    XLS 529.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898